FLUG REVUE Logo

Home | Update | Latest Issue | GALLERY | FR Inside | Datafiles
StarLIner 200

Alliance StarLiner 200

Type (Muster)
70-seat regional jet (Regionalverkehrsflugzeug)

Country (Land)
USA

Manufacturer (Hersteller)
Alliance Aircraft Corporation
100 Main Street, PO Box 9000
Dover, NH 03821-9000
USA

Phone: 001-603/8000
Fax: 001-603/334-8101
Web: www.allianceaircraftcorp.com



General (Allgemeine Angaben)
Crew (Besatzung): 2
Passengers (Passagiere): 70 in standard configuration, five-abreast, at 32 in seat pitch. Also, a 90-seat StarLiner 300 is planned

Power plant (Antrieb): 2 x turbofans, type not yet defined, but Rolls-Royce Germany BR700 mentioned as baseline
Thrust (Schub): 2 x 13500 lbs or 16000 lbs for the stretched StarLiner 300



Dimensions (Abmessungen)
No details available

Cabin width (Kabinenbreite): 3,44 m
Cabin height (Kabinenhöhe): 2,15 m



Weights (Massen)
Operating empty weight (Leermasse): 20270 kg or 23265 kg for the StarLiner 300
Max. payload (Nutzlast): 8165 kg or 9980 kg for the 90-seater
Max. fuel (max. Kraftstoff): 10880 kg
Max. take-off weigth (max. Startmasse): 35600 kg or 40360 kg for the StarLiner 300
Max. Landing weight (max. Landemasse): 34100 kg or 40360 kg


Performance (Flugleistungen)
Max. cruise speed (max. Reisegeschwindigkeit): Mach 0.84 / 350 kts CAS
Maximum altitude (Gipfelhöhe): 41000 ft
Take-off field length (Startstrecke): 1370 to 1525 m
Landing field length (Landestrecke): 1065 to 1220 m


Customers (Kunden)
At the ILA in Berlin in June 2000, Alliance Aircraft claimed it had letters of intent from two airlines for a total of 30 aircraft.


Cost (Preis)
In June 2000, a price of 18,9 million US-Dollars for the StarLiner 2000 was mentioned, while the stretched StarLiner 300 should sell at 24,3 million.
Development costs are put at 660 million US-Dollars.


Competition (Konkurrenz)
Bombardier CRJ700
Embraer ERJ-170
Fairchild Dornier 728JET


Remarks (Bemerkungen)
Alliance Aircraft was set up and is led by Earl Robinson, a former Fairchild Dornier executive. The company plans to develop and build a whole family of regional jets at a new factory on the former Pease Air Force Base.
Before starting real work on the programme, Alliance needs to secure enough funding. At the ILA show in Berlin in June 2000, it was said that 150 million US-Dollars had already been secured and another 250 million are hoped for from two leading investment banks. Adittionaly, around 160 million will need to be contributed by risk-sharing suppliers.


History (Geschichte)
Plans call for delivery of the StarLiner 200 in the summer of 2003.


Home | Update | Latest Issue | GALLERY | FR Inside | Datafiles
Copyright 2000 by Motor-Presse Stuttgart. All rights reserved.
Last updated 21 June 2000
FLUG REVUE, Ubierstr. 83, 53173 Bonn, Germany